Expand Your Home With Seamless Additions & Accessory Dwelling Units (ADUs)
Why Consider an Addition or ADU?
Life changes — your home should too. Whether it’s a growing family, an aging parent moving in, or the need for rental income, an addition or ADU provides:
Extra bedrooms or guest suites
Private living space for family or tenants
Home offices or creative studios
Long-term investment and resale value
Some homeowners choose to expand even further with a whole-home remodel
Our Additions & ADU Services
We handle every type of expansion project, including:
Second-story additions
Garage conversions
Detached guest houses and casitas
In-law suites and multigenerational spaces
Kitchen or living room expansions
Outbuildings including post-frame workshops, garages, ag buildings and more
Many families also upgrade interiors during an addition. Explore our kitchen remodeling and bathroom remodeling services for seamless design inside and out.
Proudly Serving Williamson County
We're based in Georgetown and serve homeowners throughout Williamson County, including:
Georgetown & Sun City
Cedar Park & Leander
Round Rock & Hutto
Liberty Hill & Jarrell
Taylor & surrounding areas
What to Expect:
Investment & Timeline
Home additions and ADUs in Williamson County typically range from $75,000–$300,000+ depending on size, type, and finishes.
Budget Tiers:
Garage Conversion / Small Addition
($75K–$125K)
-
250–400 sq ft converted space
Basic finishes (LVP flooring, standard fixtures)
One bathroom added
Electrical and HVAC extended
Matches existing home exterior
Room Addition / In-Law Suite
($125K–$200K)
-
400–600 sq ft new construction
Quality finishes throughout
Full bathroom included
Separate HVAC zone
Seamlessly integrated with existing home
What Affects Your Final Price:
Square footage: Cost per sq ft ranges from $250–$400+ depending on complexity
Foundation type: Slab vs. pier-and-beam affects cost and timeline
Bathroom inclusion: Adding plumbing increases cost $15K–$30K
Kitchen inclusion: Full kitchen adds $25K–$50K
Structural complexity: Second-story additions require foundation reinforcement
Site conditions: Slope, soil type, and utility access affect foundation costs
Detached ADU / Second Story
($200K–$300K+)
-
600–900 sq ft independent living space
Custom finishes and fixtures
Full kitchen and bathroom
Separate utilities and entrance
Matches architectural style of main home
Timeline:
Garage conversions: 2–3 months
Room additions: 3–5 months
Detached ADUs: 4–7 months
Second-story additions: 6–9 months
*All estimates include permits, materials, labor, and our 3-year warranty. Final pricing determined during your Planning Call based on your specific scope and material selections.
👉 Schedule Your Planning Call to get a detailed estimate for your specific project
Design & Craftsmanship That Fits
Our team ensures additions don’t look “tacked on.” We match exterior materials, rooflines, and interior finishes so your new space flows seamlessly with the existing home.
Our Process
Planning Call – Share your goals and must-haves.
Concept Design – 3D renderings and layouts.
Detailed Estimate – Transparent pricing and material choices
Construction – High-quality craftsmanship delivered on schedule
Final Walkthrough with you.
See our detailed remodeling process to understand how additions and ADUs fit into a full project flow.
ALL PROJECTS INCLUDE OUR GUARANTEE PACKAGE
-

$500/Week Late Penalty
Paid to YOU in cash if we miss deadlines
-

Budget Lock Protection
We pay cost overruns, not you
-

3-Year Warranty
On everything we build
-

Direct Owner Access
Personal cell with 4-hour response guarantee
What’s Possible With Your Addition/ADU?
Not Sure Where to Start?
Take our 2-minute Project Personality Quiz to discover:
- Your project personality type (Detail Detective, Money Minder, Schedule Stickler, or Project Partner)
- Which guarantees matter most for YOUR project style
- Your custom 15-page remodeling guide (worth $47)
Over 247 Williamson County homeowners have discovered their type. Find yours in 2 minutes:
FAQs
-
We design and build second‑story expansions, room additions (such as larger kitchens or living rooms), garage conversions, in‑law suites and detached accessory dwelling units (ADUs).
-
Timelines vary: room additions may take 3–5 months, while second‑story additions or detached ADUs can take 6–9 months, depending on design complexity and permitting. We provide a detailed schedule before construction begins.
-
Additions and ADUs typically require building, structural, electrical, plumbing and sometimes zoning permits. We handle all permit applications and inspections.
-
Yes. We select materials and architectural details that complement your existing home so the addition looks seamless.
-
We can discuss potential return on investment and connect you with lenders who specialize in home construction and remodeling loans
-
It depends on the scale and location of the addition. For smaller room additions you can often remain at home; larger second‑story projects may require temporary relocation during certain phases.
-
An accessory dwelling unit (ADU) is a secondary housing structure on your property, such as a garage apartment or detached cottage or casita. ADUs are ideal for multi‑generational living, rental income or guest accommodations.
-
Adding square footage typically increases the appraised value and property taxes. We can provide resources to help you estimate the impact and plan accordingly.
-
Our design takes into account existing HVAC, electrical and plumbing systems. We integrate new systems seamlessly to ensure efficiency and balance across the entire home.
-
Costs depend on size, design, finishes and site conditions. We provide a detailed estimate after assessing your property and discussing your goals.